Breaking requirements for promotion to 2nd Dan Black Belt:
For
promotion to 2nd Dan Black Belt,
testing candidates are required to perform several breaks consisting of a combination of both hand and foot, attacks and blocks,
while using both the right and left sides. The candidate will be required to
perform both power breaks and technique breaks. These breaks will be selected from those suggested to the test board by the testing candidate, and/or will be
breaks specified by the test board.
The student may choose any five (5) techniques from the list below as suggestions
for their breaks at testing. These choices must include one (1) power foot break,
one (1) power hand break, one (1) technique foot break, and one (1) technique hand break.
The test board has the prerogative to choose alternative breaks for the testing candidate
from among any of the breaking requirements for 1st Dan Black
Belt and below. Therefore, it is likely that the testing
candidate may perform more than just the five (5) suggested breaks – which may also include replacement breaks other
than those suggested to the test board.
The breaking techniques chosen
for suggestion to the test board by the testing candidate may include any punch, block, thrust, strike and kick learned during
their Taekwon-Do career.
Additional, or alternative breaks requested BY the test board may include ANY breaking requirement listed for 1st Dan Black Belt – the testing candidate may choose
to use either their right or left side for these breaks. Additional, or alternative
breaks may also include breaking with ANY technique listed as a requirement for promotion to 1st geup High Red Belt and below – the test board will decide whether the student breaks with their right or left side for these breaks.
It is also expected that skill will increase as the testing candidate matures
in size and/or rank. Therefore, it is assumed that techniques chosen by the test
board from previous rank breaking requirements would most likely involve an increase in the number of boards or tiles.
Back
to Breaking Requirements
Back
to 2nd Dan Testing Requirements